Introducing The Plug
The Plug combines the power plant, the network, and the data center into one seamless solution. Developed across 3-20 MW hydropower plants, energy is used directly on-site, removing the need for grid connections. It integrates satellite networks to deliver low latency (20-33 ms) for AI model training. These remote, green data centers, equipped with cutting-edge AI servers and cooled by natural water sources, provide a fully comprehensive solution for AI off-takers
Capacity
With 1 GW of green energy distributed across 100-120 Plugs, we can power nearly 70.000 NVIDIA DGX B200 units..
24/7 Green Energy
Unlike solar and wind, hydropower plants can generate electricity continuously, providing a consistent and reliable energy supply 24/7, regardless of the time of day
Service
Our solution is perfectly tailored for training AI models, offering the following advantages:
High Node-to-Node Bandwidth: Ensures fast data transfer between AI servers.
Process Resiliency: Reliable operations with built-in fail-safes.
High Energy Capacity: Adequate power supply to meet the demands of intensive AI workloads.
Moderate Network Requirements: Efficient network setup to support AI model training without excess complexity.
Satellite Network
The low latency provided by network providers marks a quantum leap, making it possible to establish AI model training data centers in remote areas, meeting the rising demand for training large language models (LLMs).
The satellite network enables fast, low-latency internet connections in data centers located near our hydropower plants, ensuring seamless AI operations
Location
Colombia’s hydropower potential allows us to develop all of our "plugs" in guaranteed areas, located less than 2 hours from major cities. Thanks to the country’s exceptional geographic features, our facilities are strategically positioned to ensure efficient access and a seamless connection to high-demand centers.
This proximity not only optimizes response times and logistics but also reduces operational costs, enabling us to provide more accessible and cleaner energy for remote data centers
Aggregated capacity
Our vision is to provide an integrated green AI capacity, where all of our plugs combine to create a powerful, unified force. By aggregating the capacity of multiple hydropower-driven data centers, we offer a scalable and efficient solution that meets the growing demand for AI services. This approach ensures that our green energy resources are utilized to their fullest potential, delivering seamless and sustainable power to fuel AI operations across multiple locations